First Netherlands Classroom Addition
Grand Rapids, Michigan
This new addition will offer 6 new classrooms, and a new larger egress corridor to help with congestion at the entry and exits. Remodeling toliet rooms with additional fixtures. Separated from the existing building with a one hour rated walls so no new fire protection systems are required.
2,906.0 SQ FT
WorshipDesign Build
Contributors
-
Dan Vos Construction Co.
-
Classic Engineering
-
Burgess Concrete Construction
-
Steel Systems Inc
-
Soils & Structures, Inc.