Menu
Harvest Bible Chapel – Spring Lake
Renovation and Addition
Spring Lake, Michigan
This recently remodeled church was, at one time, strictly warehouse space. To complete this project, 12,842 sq. ft. was renovated into Chapel space while 12,805 sq. ft. was renovated into education space.
In order to complete the new chapel and education space, DVCC completely removed the roof structure, inset steel columns and steel roof trusses within the existing warehouse walls.
Various features of the space include polished, concrete floors throughout the chapel space, an exposed metal roof deck complete with K-13 acoustical material in the chapel, six inch rigid poly roof insulation and a new fire wall to separate different groups’ usage.
25,647.0 SQ FT
Architectural EngineeringCommercialCivic | GovernmentEducationWorshipDesign Build
Contributors
-
Dan Vos Construction Co.
-
Classic Engineering
-
Steel Systems Inc
-
Buist Sheet Metal Company, Inc.
Accolades
-
Dan Vos is a unique breed of contractor. They actually do what they say they are going to do!
Dave Wisen, Grace Church/Harvest Bible Chapel