Menu
Ice Mountain
Stanwood, Michigan
This was a complete Design/Build Project of a spring water bottling plant. The building addition included both production area and warehouse area and LEED Silver protocol was followed.
Pre-Cast Wall panels were used in the construction to meet a very tight completion schedule. We relocated existing concrete “tilt-wall†panels for the new expansion project.
Food and Beverage ProcessingIndustrial | ManufacturingDesign Build
Contributors
-
Dan Vos Construction Co.
-
Exxel Engineering
-
Windemuller
-
Van Haren Electric Inc
-
Classic Engineering
-
Steel Systems Inc
-
Welch Tile & Marble
-
Driesenga & Associates
-
Central Ceiling West